Design, Dubai Municipality & DEWA approvals, and construction — handled by a single team, on a single contract. No coordinating between separate designers and contractors.
Sq. Ft. Delivered Across the UAE
In-House Architecture & Engineering
Years Delivering Turnkey Villa Projects
Team, From Concept To Handover
We hold responsibility for every stage — this is what "turnkey" actually covers.
Flooring, joinery, gypsum work and finishes — reimagined around natural materials and considered detailing.
Interior renovation paired with outdoor landscaping and pool work, designed and built as one project.
Ground-up renovation across multi-storey family homes, sequenced so your household can plan around the build.
Between a separate designer, contractor and MEP team, that's usually where the delays and cost overruns start. We don't split it.
Your designer and your builder are the same people — no coordination gaps between separate firms.
A single point of accountability from design through handover, on one contract.
Design decisions are developed with execution in mind, so what gets drawn is what gets built — on budget.
Procurement, MEP, construction and finishing managed together, not handed off between vendors.
Every villa renovation follows the same six-stage sequence.
Brief, budget and vision.
On-site survey and constraints.
3D renders and material direction.
MEP drafts and firm pricing.
Sourcing and single-team build.
Snagging closed, keys delivered.
It depends on scope and villa size, but most full interior renovations run from initial design through handover across several months once approvals are secured. We give a firm, project-specific timeline after the site assessment and design stage — not before.
Most structural changes, MEP alterations and certain fit-out works require authority approval (Dubai Municipality, DEWA, and Civil Defence depending on scope). We handle the permitting process as part of the turnkey scope, so you're not managing separate applications yourself.
For partial renovations, often yes — we can sequence work to keep parts of the home livable. For full gut renovations, most clients relocate for the construction phase. We'll advise on the right approach once we've seen the scope.
Concept design, authority permitting, fit-out construction, and landscaping and handover are all part of the standard turnkey scope — see the checklist above. Material sourcing, MEP engineering and project management are included; we'll confirm exact inclusions against your brief.
Fill in the brief below — we'll respond with next steps, not a generic sales call.